poplabreak.blogg.se

Occupancy permit ontario building code
Occupancy permit ontario building code




NOTE: WETT certification shall be provided for all wood burning appliances.Ībove Ground Plumbing: All drains, wastes and vents complete and under test.Manufacturer specifications shall be on site.Fireplace, fire stops and chimney flue installed.Masonry/Factory Built Wood Burning Fireplace: Prior to covering. Water test with a minimum 10'-0" of pressure head.Plumbing roughed-in, capped and under test: In-Floor Plumbing: Prior to pouring concrete. A final inspection (when grading is complted).A copy of the soil analysis or imported material analysis must be provided to the Building Inspector at this time.Substantial completion of distribution pipes and septic tank.On-Site Sewage (Septic System): Prior to backfilling. A ball test may be requested by the Building Inspector.Sanitary sewer pipe complete and under test with five psi air or filled with water.Water service pipes complete and under test at minimum 50 psi.Water & Sanitary Sewer Drainage Pipe: Prior to backfilling. Weeping tile with proper stone coverage complete.Required reinforcement for foundation wallsįoundation/Backfill: Prior to backfilling.All formwork and re-bar (as applicable) to be in place.įoundation/Slab Reinforcement: Prior to pouring concrete. Typical Inspection StagesĮxcavation: Prior to pouring concrete. Any building elements covered before the related mandatory inspection has been made must be uncovered for inspection and passed before the completion of the project. When conducting the mandatory inspections, the Building inspector must be able to see that part of work under inspection. These stages are typically listed as required inspections on the reviewed permit drawings issued with your building permit. A Building Inspector will be required to review your project in several stages during construction.






Occupancy permit ontario building code